Skip to content

Bathrooms

Bathroom Renovations in Dublin

A bathroom renovation is the most service-heavy room in the house. Water, waste, electrics and ventilation all have to be right before a single tile goes on the wall, which is why we treat the plumbing and preparation as the heart of the job rather than an afterthought.

A complete bathroom, not a cosmetic one

We strip the room back, check the condition of the walls, floor and existing services, and plan the new layout around the waste and water positions that are actually achievable. From there we install the new sanitaryware, shower and screen, carry out the electrical work for lighting, shaver points and extractors, tank and tile the room, and finish it properly.

The result is a bathroom that is watertight, ventilated and built to last, not one that looks finished but leaks behind the tiles six months later.

Planning a bathroom that works for the house

Family bathrooms, en-suites, guest bathrooms and downstairs WCs all have different priorities. A family bathroom needs durable surfaces and enough storage; an en-suite needs to fit a lot into a small footprint; a guest WC can be more expressive. We plan around who will use the room and how often.

Access matters too. If the bathroom is upstairs in a period Dublin home, or the only bathroom in the house, that shapes the programme and the order of work.

Tiling, brassware and the details

Tiling is where a bathroom is won or lost: setting out from the right point, keeping cuts sensible, and getting falls right in a wet area. We set out the room before tiling begins and agree the layout with you. Brassware, sanitaryware and furniture are then fitted and checked.

What the work covers

  • Full strip-out and disposal of the existing bathroom
  • First and second fix plumbing, including wastes and supplies
  • Bath, shower, WC, basin and furniture installation
  • Shower screens, doors and enclosures
  • Electrical work for lighting, shaver points and extractor fans
  • Tanking, tiling and waterproofing to wet areas
  • Floor preparation and floor tiling or flooring
  • Sealing, finishing and clean-down

Worth thinking about before you start

  • Waste pipe positions often limit where a shower or WC can go; check before finalising the layout.
  • Ventilation is essential in a bathroom with no opening window.
  • Agree tile setting-out and any feature walls before tiling starts.
  • If it is the only bathroom in the house, plan the programme so the gap without facilities is as short as possible.

How the project works

  1. Step 1

    Get in touch

    Call, email or send the enquiry form with a short description of what you are planning. We will ask a few questions to understand the project.

  2. Step 2

    Visit and measure

    We call out, measure the space properly and look at what is behind the walls and under the floor, so the plan is based on the actual room.

  3. Step 3

    Free tailored quotation

    You receive a quotation based on the work agreed, the specification chosen and the condition of the space. No obligation, and no pressure.

  4. Step 4

    Work and handover

    We agree a programme, carry out the work in sequence and check the finished result with you before we finish up.

Why choose Ruach Kitchens

  • Over 20 years of experience in kitchens, bathrooms and building work
  • One coordinated team instead of separate trades
  • Free, tailored quotations based on your actual room
More about us

Where we work

We carry out this work across Dublin City and County Dublin. Our base is at Bunratty Road in Coolock, on the northside, and we travel throughout the city and county for projects.

Frequently asked questions

How long does a bathroom renovation take?

It depends on the size of the room, the condition of what is underneath, and the tiling. We set out a programme with you before starting and keep you updated as the work progresses.

Do you supply the bathroom suite and tiles?

Yes. You can choose from our bathroom collection, including baths, sanitaryware, furniture, tiles, brassware and showers, and we will fit what you select.

Can you move the toilet or shower to a different wall?

Often, but it depends on the waste run and the floor structure. We check this on site before the layout is agreed, because it is the single biggest constraint in a bathroom.

Do you handle the tiling as well?

Yes. Tiling and the preparation underneath it, including tanking in wet areas, are part of the renovation.

Related services

Get a free, tailored quotation

Every project is quoted individually. Tell us about the space and what you want from it, and we will arrange a visit.